We are looking for a Program Scheduler who has experience in the construction of schools, colleges, or universities to support LAUSD (Los Angeles Unified School District). The successful candidate will be responsible for scheduling. If you are looking for an exciting opportunity to join a growing team of dedicated Managers and engineers, we're interested in meeting with you.
Duties:
- Develops and maintains the program schedules identifying relationships, logic, milestones, and constraints for construction projects of various types
- Monitors and actively participates in the project and program scheduling issues while administering best practices and standards
- Obtains accurate and timely program schedule updates from project teams and performs QA/QC on information received
- Creates and develops conceptual what-if schedules for multiple project types including large complex multi-year projects
- Performs Critical Path analyses and Earned Value analyses
- Prepares ad-hoc reports and analyses as directed by management
Minimum Requirements
- Eight (8) years full time paid professional experience in Scheduling for an owner or General Contractor, working on multiple educational facilities or public works projects
- Graduation from a recognized college or university with a Bachelor’s degree in Architecture, Engineering, or Construction Management.
- Proficiency in Primavera 15.1 or above and MS Office Suite
- Experience with projects using Design-Bid-Build and Design-Build project delivery methods
PLEASE DO NOT SUBMIT RESUMES FROM OTHER INDUSTRIES SUCH AS GAS/ENERGY; MANUFACTURING/PRODUCTION; ETC.
Qualified female and minority applicants are encouraged to apply. Please submit resumes and expected Salaries by email.
The candidate must have either a green card or permit to work (US Citizen). No visa sponsorship is available.
No Relocation assistance allowed
Job Types: Full-time, Contract
Pay: Up to $53.00 per hour
Schedule:
- 8 hour shift
- Day shift
- Weekends as needed
Education:
- Bachelor's (Preferred)
Experience:
- Primavera: 8 years (Preferred)
- construction scheduling: 8 years (Preferred)
Work Location: Multiple locations