Job Description
We're seeking a seasoned Safety Manager with 7 to 10 years of experience in critical facilities, semiconductor, or similar projects to join our team! If you're armed with effective communication skills, OSHA certifications, and a keen eye for detail, you're just who we need. From managing multiple construction sites to producing daily safety reports and conducting site inspections, your role will be pivotal in ensuring a safe working environment. Preferred qualifications include a degree in construction or safety management and additional certifications.
Minimum Required Qualifications:
- Minimum 7 to 10 years construction/safety experience in critical facilities, mission critical, semiconductor, or similar scope projects primarily for vertical building construction.
- Effective communication skills and ability to work with all levels of the project team.
- Evidence of completing OSHA 30 Hour Construction Outreach Training within the last three years. In the alternative, evidence of completing the OSHA 500 or OSHA 502 Class may be provided.
- Current First Aid and CPR training from a provider recognized by OSHA.
- Minimum of holding a valid Certified Safety Professional (CSP) or Construction Health and Safety Technician (CHST) certificate issued by the BCSP Board of Certified Safety Professionals.
- Flexibility in schedule and transportation to work at multiple sites based on assigned schedule and duties and perform time management as required to meet all the position requirements.
- Proficiency with Microsoft office and related spreadsheet and database software.
- Ability to work in fast-paced environment.
- Ability to provide management oversight on behalf of Client and effectively complete reporting on a daily basis as required by the program.
Preferred Qualifications:
- Construction management, safety management, safety engineer or similar degree is preferred.
- Additional safety/health certifications and credentials.
- Background in Electrical construction.
Tasks and Responsibilities:
- Look ahead on high-risk activities and assisting with risk analysis of upcoming work.
- Produce daily observations and indicator/trend reports on Procore.
- Manage, oversee, and audit construction safety at Data Centers. This includes management of multiple New Construction and Renovation projects.
- Monitor compliance with site safety programs and requirements, which defines safety requirements that contractors must comply with.
- Perform Daily Safety reviews of work in progress in accordance with current Safety Regulations and Standard Operating Procedures (SOP).
- Conducts construction site safety audits to identify improper procedures, checks equipment and facilities for hazardous conditions, and recommends corrective actions.
- Audit and review Methods of Procedures (MOPs) for safety compliance and to minimize site impacts.
- Submit Daily, Weekly, and Monthly Safety reports required by the Program.
- Monitor compliance to all current OSHA requirements that relate to the specific construction projects.
- Report to the Director of Safety, including but not limited to, attending any required meetings or providing safety reports/analysis as requested.
- Immediately notify the Director of Safety of any incident or recordable injury on projects.
- Monitor Contractor compliance with COVID-19 regulations as defined by OSHA. Confirm that Contractor Safety Plans are complete and updated to address COVID Safety Guidelines on each project site.
- Confirm that Contractor is reporting all recordable injuries and near-miss incidents within the required timelines and by filing the proper forms. Review the report for accuracy before filing.
- Perform ongoing construction site safety inspections and generate safety report for all site visits.
- Identify site safety hazards and provide immediate direction to contractor safety representative to eliminate or mitigate them.
- Perform reviews and inspections of the jobsite to assure compliance with health and safety regulations and applicable codes.
- Participate in site inspections and testing as necessary for required permits, including confined space, hot work, trenching, etc.
- Confirm that the New Hire Safety Orientation on-line safety training are available onsite.
- During construction, coordinate and meet periodically with the Contractor’s safety representative.
- Confirm that contractors are performing tailgate safety meetings and training as required by their Contract and/or OSHA requirements.
- Attend pre-construction meetings to present Owner’s safety program and the role of the field safety representative. Provide comprehensive safety support and guidance for Project Team.
- Monitor adherence to zero tolerance and corrective action policy for workers found not in compliance with the Program’s safety policy.
- Conduct project safety stand-downs with all crews to review the incident for injuries. Educate all site workers on how to prevent a repeat accident.
- Additional duties as assigned by the Program Safety Manager
Submission Requirements:
At a minimum, the candidate’s professional resume must include the following:
· List of all Educational Achievements
· List of all Professional Licenses or Certificates
· List of Awards Received
· Detailed Employment History with each company or government agency including:
o Name & Contact Information of the firm or agency
o Start Date and End Date (Month & Year)
o Positions Held
o List of Projects / Programs Managed including project value, location of assignment, roles and responsibilities and contribution to each project
#safetymana
ger #construction #safetyfirst #OSHAcertified
PMCS has expanded our expertise into the private sector, particularly focusing on large scale advanced technology and mission critical projects. Our team has delivered microchip manufacturing facilities, cleanrooms, labs and large scale Data Center facilities. We’ve expanded our reach into Northern California, Arizona, Oregon, Washington, Texas, and other states. PMCS supports entities such as QTS Data Centers, Vantage Data Centers, Cologix Data Centers, Intel, Lam Research, Samsung, TSMC, and others.
PMCS Group’s project portfolio also includes numerous public facility projects, such as the Port of Long Beach Fireboat Station 20 project, major water resource projects, including the City of LA / LAWA Argo Drain Sub-Basin Facility Project, and major educational projects, like the California State University Long Beach Parkside North Housing Residence Project. We bring extensive transportation and infrastructure project experience, including our work as a joint venture partner on LACMTA’s Purple Line Project and our work on LA County Department of Public Works’ Santa Anita dam.
We believe that every project success is based on partnering, collaboration, and consolidating resource pools to provide our clients with the optimum balance of flexibility and responsiveness needed to achieve high quality results for the best value.