Required Visa Status:
Citizen | GC |
US Citizen | Student Visa |
H1B | CPT |
OPT | H4 Spouse of H1B |
GC Green Card |
Employment Type:
Full Time | Part Time |
Permanent | Independent - 1099 |
Contract – W2 | C2H Independent |
C2H W2 | Contract – Corp 2 Corp |
Contract to Hire – Corp 2 Corp |
Description:
Summary/Objective: Promotes the company mission statement by joining the Superintendent to form a team who work together to create a safe work environment, build a quality project, and keep projects on schedule while earning a fair and reasonable profit.
EDUCATION AND EXPERIENCE:
- Minimum 5 years of Project Management experience
- Includes 5 plus years as an APM.
- Scheduling:
- Understands and create an Overall Project Schedule
- Includes understanding critical milestone
- Understand and update an active Construction Schedule
- Includes understanding the critical path and its
- Leads a pull a schedule and update Work Plan
- Understand material delivery dates and when they are
- Can effectively navigate and resolve conflicts regarding
- With Trade Partners
- With Arch/Engineers
- Knows when to RFI an issue or resolve effectively without
- Can effectively run a Trade Partner coordination
- Includes setting an agenda and maintaining the
- Understands critical issues for
- Runs the meeting
- Can effectively run OAC
- Includes setting an agenda and maintaining the
- Understands critical issues for
- Assists in running the meeting effectively where
- Can effectively solve clashes and conflicts of building systems in a manner that does not compromise the engineered basis of
- Knows when documentation is required related to drawing and specification updates and or cost
- Develops and manages an effective QAQC
- Manages a project utilizing BIM technologies:
- Coordinate a 3d design for
- Coordinate a 3d design layout in the
- Utilize BIM Glue and Navisworks software when appropriate to assist in the BIM process on a project.
- OSHA 30 certified
- Proven track record of a strong safety culture on the jobsite – is a leader in
- Has experience building from the ground up on more than 2 projects minimum?
- Understands construction means and methods for all scopes of work.
- Can communicate and develop relationships with City, Local Agencies and Utility
- Demonstrates a thorough and detailed understanding of:
- Plans
- Specs
- General Conditions
ADDITIONAL ELIGIBILITY REQUIREMENTS:
Work Authorization/Security Clearance Requirements: Authorized to work in the United States
How To Apply:
Incase you would like to apply to this job directly from the source, please click here
Responsibilities:
ESSENTIAL FUNCTIONS:
- Serves as the main point of contact for the Owner, Engineer, and Architect
- Oversee the project to make all critical project
- Estimating and Preconstruction:
- Can affectively assist in Harper’s efforts regarding estimating, scheduling, and interviewing
- Is responsible for the project preconstruction deliverables and estimates while working alongside Estimating. This includes:
- Executive Summary
- Schedule of Values
- Qualifications and Clarifications
- Allowances
- Project Schedule
- General Conditions
- Three quotes on each scope
- Value Engineering
- Produces, Collects and Processes all pay applications and invoices for the
- Includes collections and
- Ensure the creation, approval, and management of:
- Owner contracts
- Subcontracts, POs, and FSAs
- Cost controls/Project Financials
- Project engineering – submittals, RFI’s, document management,
- Ensure proper project decisions – (responsible to ensure Superintendent is making timely and appropriate decisions related to the field.)
- These involve the following:
- Schedule
- Deliveries
- Logistics, Staging & Phasing
- Quality Control
- Employee staffing levels
- Responsible for communication with Owner and Architect/Engineer related to office and field
- This includes:
- Understanding issues and assisting in resolving issues
- Knowing the proper time to involve Owners and Arc/Engineers
- Leadership regarding BIG 5:
- Safety/SOAR
- Core
- Procurement/Scheduling
- Pre-Install Meetings
- Exterior Skin Systems Meetings
- Oversee the Project Safety Requirements
- Ensure Harper safety requirements are explained, implemented, and demonstrated
- Project specific safety pre-planning
- Development of project-site specific SOAR Orientation document
- Soar Implementation – if allowing other Harper staff to conduct orientations ensure proper message and execution of the
- OSHA standards are understood and
- Weekly Toolbox Talks with all active trades.
- Safety Stand down Training as
- Participates in the timely and effective investigations of all incidents including injuries, property damage, behavioral issues and near
- Weekly site safety inspections in Procore
- Ensure and is responsible for creating Schedules along-side
- Ensure and is responsible along-side the Superintendent to determine the sequencing of the work.
- Develop and manage – takes the lead on project QAQC (has passion)
- QA example:
- Pre-installation meetings
- QC example:
- Visual and documents inspections of work in place
- Oversee coordination of all trade partners
- These involve the following:
- Project site specific logistics/use including associated
- Scheduling of each trade (who goes where and when to start)
- Developing and implementing recovery strategies to maintain project schedule.
- Clarifications of design versus installation (RFI’s)
- Schedule for the trades (durations and commitments of durations)
- Manage office personnel to ensure staff development.
- This includes Assistant PMs, Project Engineers, and Interns
- Also includes assisting in the development of Superintendents and Field Staff
- Ensure proper project set-up in
- Ensure project data is kept current and
- Develop and implement working relationship with Safety Manager
- Assist Owner and Design teams in obtaining required
- Assist the Superintendent on implementation of inspections for the
- Project reporting:
- Owner Monthly Reports
- Monthly Job Costs Status Reports
- Ensure proper project close out including required documentation to
- Ensure by documenting and executing a proper Harper punchlist prior to inviting Owner and Design Team
- Have knowledge and enforce compliance of local building codes per
- Have knowledge of the required compliance of all ADA code requirements
- Procore
- Fill-In Daily Log
- Read commitment scopes of work and understand
- Navigate and understand how to utilize
- Utilize and understand all functions of the drawings
- Recent Drawings
- Overlay function of previous drawings
- Attachments to drawings
- Create Inspections
- Know where and how to utilize information from meeting
- Create and track an
- Utilize the photos
- Create and maintain the punch
- Create an RFI for review by Superintendent and seek RFI information where
- Know where to find the schedule, read and
- Understand how to navigate and seek information from Specs
- Understand how to navigate and seek information fromAbility to enter timesheet in
SUPERVISORY RESPONSIBILITIES:
Work Environment: This position is required to work in a variety of conditions relative to construction jobsite environments and must be able to perform the physical requirements of the job, as assigned. Exposure to weather, heat, etc. is expected.