Job Description
Pipe Crew
Complete Development, Inc. is a full-service site contractor, encompassing all areas of project development. We have been in business since 1983, working in both the private and public sectors of Central and South Florida. Founded on Christian principles; CDI believes in our employees, clients, and their objectives. We expect our new team members to hold themselves to the same level of integrity as our company.
We are a civil utilities company prepared to grow. Most of our projects are in Hillsborough, Pasco, and Polk County. Sometimes we have jobs in Pinellas and Orange County. We provide services for earthwork, grading, underground utilities (Water, Sewer & Storm), building pads, fire lines and much more. We need someone who is dedicated and willing to help.
Job Descriptions:
A- Hillman& Tailman- As a Hillman/Tailman, you will play a crucial role in our underground utility installation projects. You will work collaboratively with the Pipe Crew, ensuring the safe and efficient installation of water, sewer, and drainage systems while maintaining quality and adhering to project specifications. The Hillman and Tailman perform complementary tasks to support the successful completion of underground utility projects. Key Responsibilities: • Trenching and Shoring: Assist in the excavation process by trenching and shoring to prepare the work area for pipe installation. • Pipe Handling: Handle and position pipes and other materials, ensuring they are in the correct location for installation. • Safety: Strictly adhere to all safety procedures and guidelines, creating a safe working environment and complying with regulatory requirements. • Equipment Operation: Operate equipment as required, such as forklifts or other machinery, to support pipe handling and installation. • Materials Management: Assist in the inventory management of materials and supplies required for the project, including ordering, tracking, and reporting. • Quality Control: Support the installation of underground utility systems, ensuring work meets project standards, blueprints, and design specifications. • Teamwork: Collaborate effectively with the Pipe Crew, Pipe Crew Foreman, and other team members to complete tasks efficiently. • Communication: Maintain effective communication with team members and supervisors, reporting progress, challenges, and equipment issues as needed. • Documentation: Maintain accurate records, including daily work logs, equipment usage reports, safety documentation, and project reports. • Problem Solving: Identify and address operational challenges or issues that may arise during underground utility installation.
B- Pipe Layer- The individual is responsible for installing water lines, sewer lines, and storm drains.Maintains area around pumps stations and pipelines.
Other requirements include:
· Valid driver’s license in good standing.
· Reliable transportation to and from work/jobsite
· Complete background check and pre-employment drug screening
Job Type: Full-time
Salary: Depends on Experience
Expected hours: 40 – 55 per week.
Benefits:
- 401(k) matching
- Dental insurance
- Flexible spending account
- Health insurance
- Life insurance
- Paid time off
- Professional development assistance
- Referral program
- Retirement plan
- Vision insurance
Schedule:
- 10-hour shift
- 8-hour shift
- Holidays
- Monday to Friday
- Overtime
- Weekends as needed.
Supplemental pay types:
- Bonus opportunities